Ashgabat International Airport – TURKMENISTAN 2013-2016
Both nationally and internationally award-winning Ashgabat International Airport Project with its enermous dimensions and grandeur has become Turkmenistan’s new door to the world in the city of Ashgabat, a rising star and historical, cultural and civilization center of Central Asia. The airport has been constructed on a 1.2000-ha area and it consists of terminal buldings, runway-apron and taxiways, airside and landside facilities and new fuel facilities.
The new Ashgabat International Airport has a capacity of 1600 passengers per hour and it is equipped with a terminal building and apron consisting of a 165.851 m2 closed area with a total capacity of 14 million passengers per year and 30 passenger boarding bridges, VIP terminal and apron, T2 terminal and apron with a capacity of 280 passengers per hour, and both underground and ground parking lots with a capacity of 30.000 vehicles
Airside and landside are equipped with a total of 160 buildings
Within its airside, the airport is equipped with a 65 mt high 6.500 m2 air traffic control tower, 33.000 m2 C-Check aircraft maintenance hangar and apron with a capacity of 5 aircrafts including 3 Boeing 777 with a dimension of 100*200 mt, Cargo Terminal and apron with an annual capacity of 200.000 tons, Catering Building, Emergency-fire station buildings, ground services equipment park and workshops, parking lots with a canopy and technical centers
Within its landside, the airport is equipped with a Pilot training school and a dormitory building, Logistics management and warehouse buildings, a hospital, indoor and outdoor sports centers, a simulator building, Turkmenistan Airlines Administrative Building, Police Center, Workshops, ESTOP-BERTOS Building, Cabin Crews Building, parking lots with a canopy and technical centers
The new airport is equipped with a new 3800 mt long CAT-III, Code F runway and parallel taxiway where Airbus A380 and Boeing 747 capacity aircrafts with a total covered area of 2.450.000 m2 can take off and taxi, a 3800 mt long existing renovated runway, the main terminal apron with automated filling and VDGS automatic parking system, VIP terminal apron, Cargo Terminal apron, the Maintenance Hangar apron, T2 terminal apron, heliports, an isolated aircraft parking area and training areas.
New fuel facilities equipped with 14 gasoline and diesel tanks with a total capacity of 20,000 tons of fuel, a total of 11,110 mt pipeline with 16-inch, 12-inch, 10-inch and 6-inch diameters, 155 fuel pits, filling and discharge pumping stations, a tank filling area, a landside vehicle fuel station are constucted at the new airport.
Within the scope of airport security, the new airport is equipped with a CCTV building, camera systems, 30 km precast perimeter security wall and road, access control buildings.